With SERAIL-TECH Engineering latest innovation, vial loading and unloading under aseptic conditions and in compliance with the ‘Annex 1’ regulation is now possible. The shelves will be automatically raised/ lowered to a specific height to allow loading/ unloading operations. After completing of the freeze drying cycle, a backpusher sitting in the rear door will progressively unload the vials onto the loading table for further processing.
SERAIL-TECH Engineering master automatic loading/ unloading systems and will be happy to provide advice on how to bring your aseptic freeze drying operations in conformity with the Annex 1 regulation.